GENERAL CONTRACTOR · BALI · 6 YEARS ON SITE
Bali construction company: one contractor for every job on the island
As a full-cycle construction company and building contractor in Bali we pour foundations, raise walls, close roofs, run the wiring and hand over the keys — from villa construction to commercial fit-outs — and we also do the hundred smaller jobs nobody else wants to quote: piles, wells, septic systems, gabions, epoxy floors, glazing. Our own crews, a named engineer on every site, and a fixed written price before we start. The wet season starts in October–November, so pours, roofing and groundwork are sequenced around it.
- Fixed written quotes
- Own crews, no brokered labour
- Weekly photo & video reports
- Workmanship warranty in the contract

SEC 01 / WHAT WE DO
Every trade on one work order
Nine departments cover the entire life of a building site. Book one trade or hand us the whole programme — either way you deal with one office and one accountable engineer.
SEC A
Design & Pre-Construction
Surveys, soil data, drawings and permits — the unglamorous work that decides whether a build runs smoothly or becomes a rescue job.
SEC B
Structural Works
Foundations, piles, concrete frames, masonry and steel — engineered for Bali's soils, seismic loads and 2,000 mm of annual rain.
SEC C
Roofing & Envelope
Roofs, canopies, pergolas and safety nets that survive UV, salt air and monsoon rain without constant patch-ups.
SEC D
MEP & Utilities
Power, water, drainage and wastewater for new builds — sized correctly, installed once, documented properly.
SEC E
Waterproofing & Protection
Structural waterproofing, leak detection and timber protection — stopping the two things that ruin buildings here: water and termites.
SEC F
Specialist Finishes
Machine-laid screeds, epoxy floors, stone restoration, decking and bamboo — trades that need their own crews and their own tools.
SEC G
Wellness Construction
Commercial ice baths, infrared saunas and spa servicing for villas, gyms and retreats across Bali.
SEC H
Building & Support
Complete homes and commercial premises, extensions, and the heavy equipment to move the earth underneath them.
SEC I
Windows, Doors & Glass
Aluminium windows and sliding doors, frameless glass, shower and insect screens — and repairs for openings that already leak.
SEC 02 / TRACK RECORD
Villas, townhouses and commercial builds — delivered and documented
Townhouse complexes in Berawa, villas in Ubud, Pererenan and Umalas, and a 3,500 m² residential development — every one of them finished, handed over and lived in.
SEC 02B / GUIDE PRICES
How much does construction cost in Bali?
Every service page publishes its own guide prices, so you know the ballpark before you message us. The most-asked numbers, as 2026 “from” rates:
| Work | Guide price |
|---|---|
| Complete villa build, standard specification | from IDR 7,500,000 / m² |
| Structural shell (foundations to roof) | from IDR 5,000,000 / m² |
| Commercial fit-out (leased premises) | from IDR 6,000,000 / m² |
| Metal roof system (structure + covering) | from IDR 485,000 / m² |
| Aluminium sliding door, villa series, tempered glass | from IDR 3,650,000 / m² |
| Bio septic unit 3 m³, installed & commissioned | from IDR 21,500,000 |
| Drilled well to 60 m, cased & tested | from IDR 18,500,000 |
Guide rates only — a fixed itemised quote in IDR follows a free site survey. For the full per-m² ladder by specification class, two worked villa budgets and the line items quotes leave out, read our 2026 villa construction cost breakdown.
SEC 03 / HOW WE WORK
A process you can audit
Before you sign with anyone — us included — run the 12 checks we publish for vetting a construction company in Bali. Our process is built to pass them.
- 01
Site survey & brief
An engineer walks your land or building, measures what matters and writes down what you actually need — free, anywhere in Bali.
- 02
Fixed scope & quote
You receive an itemised scope of works with quantities and a fixed price. No allowances that quietly double later.
- 03
Build with oversight
Our own crews do the work; a named site engineer checks it against the drawings and sends you photo reports every week.
- 04
Handover & warranty
You get as-built documentation, test results where relevant, and a written workmanship warranty — then we come back if anything moves.
SEC 04 / BUILDING RESPONSIBLY
Building for a small island
Bali gives a builder sun, rain and volcanic soil in generous quantities. We design around them instead of fighting them — it makes buildings cheaper to run and easier on the island.
Water counted twice
Rainwater harvesting, recharge pits and bio-septic systems on our builds keep groundwater where it belongs — in the ground.
Local materials first
Volcanic stone, Javanese teak alternatives, bamboo and locally cast concrete cut transport emissions and support Balinese suppliers.
Waste sorted on site
Concrete offcuts become fill, timber offcuts become formwork, and what's left leaves the site sorted — not dumped in a ravine.
Passive before active
Cross-ventilation, deep eaves and correct orientation reduce air-conditioning loads before a single compressor is specified.
Chemicals with datasheets
Termite treatments, coatings and admixtures are chosen with documented safety data — important on an island that drinks its own groundwater.
Built to be repaired
We detail buildings so parts can be maintained and replaced — a roof you can re-coat beats a roof you must rebuild.
SEC 05 / CLIENT WORDS
What owners say after handover
They quoted line by line, then billed exactly that. In two years of building in Bali this was the first time the final invoice matched the first one.
Our septic, well and foundations were done by three different quotes from other companies. BCW did all three in one mobilisation and the site was clean when they left.
I manage properties remotely. Their Friday reports are the only ones I never have to chase — photos, numbers, next week's plan, done.
SEC 06 / QUESTIONS
Straight answers first
Do you take on small jobs, or only full builds?
Both. The same crews that build our housing projects also install a single septic tank, drill one well or lay one epoxy floor. Small jobs are how most clients first test us — we quote them with the same written scope and warranty as a full build.
How do you price work?
After a free site survey we issue an itemised scope with quantities and a fixed price in IDR. Guide prices are published on every service page so you know the ballpark before you even message us. The final number moves only if the scope moves — and then in writing. To line our quote up against others, use our guide to comparing construction company quotes line by line.
Can you work while I'm overseas?
Most of our clients are abroad for at least part of their project. You get weekly photo and video reports, a shared progress album, and payments tied to completed stages you can verify from the reports — not to dates on a calendar.
Are your prices in IDR and do they include materials?
Yes — quotes are in Indonesian rupiah and itemise labour and materials separately, so you can see exactly what you're paying for. If you prefer to supply your own materials, we'll quote labour-only and tell you honestly which materials are worth buying yourself.
Do you provide a warranty?
Every contract includes a written workmanship warranty — the duration depends on the trade (structural work carries the longest cover). If something we built moves, cracks or leaks within the warranty period, we come back and fix it at our cost.
Which areas of Bali do you cover?
All of it. Our crews are based around Denpasar and Canggu, and we run projects from Uluwatu to Ubud and out to the east coast. Site surveys are free island-wide.
When should I confirm a project to break ground before the rainy season?
Work backwards from the weather. For foundations and structure to be moving through the dry window, the survey, scope and fixed quote need to be settled several weeks earlier — for a Q4 2026 start, that means confirming by late September. The quoting itself is quick; what takes time is agreeing a scope precise enough to price fixed.
Does building work stop during Bali's rainy season?
No — it re-sequences. We plan each programme so the weather-exposed stages sit in the driest months available and interior trades carry the project through the wet ones. A build that starts late in the year simply runs those stages in a different order; the finish date is protected by sequencing, not by luck with the weather.
How much does it cost to build a villa in Bali?
As 2026 guide figures: a complete villa runs from IDR 7,500,000 per m² at a standard specification and from IDR 12,000,000 per m² premium, with architect-led projects reaching IDR 18,000,000–25,000,000+ per m². A turnkey 150 m² two-bedroom villa lands around IDR 1.35–2.08 billion including design, permits, well, septic and power — before pool and furniture. The full maths is in our villa construction cost breakdown.
How long does a villa build take with our crews?
A 150 m² villa typically takes nine to twelve months from approved design: roughly 6–8 weeks of groundwork and foundations, 12–16 weeks of structure, then envelope, MEP and finishes. Add 2–4 months up front for design and the PBG if you are starting from a bare plot; larger two-storey homes run 10–14 months. You receive the programme with the quote, and weekly photo reports track progress against it.
Can foreigners build property in Bali?
Foreign owners build with us all the time — construction itself is the straightforward part. Every build needs a PBG building permit issued against the plot's zoning, and our construction permit support handles the drawings, calculations and process coordination. How you hold the land or lease is a legal question for your notary; once that structure is in place, we survey, quote and build the same way for every client.
What does villa construction cost per sqm in Bali?
Villa construction cost per sqm in Bali runs in tiers: structural shell, standard turnkey, and premium finish. Instead of a vague villa renovation cost estimator, you get an itemised bill of quantities — every square metre priced line by line before you sign.
Do you build luxury villas on Uluwatu clifftops?
Yes — luxury villa construction in Uluwatu and Bingin starts with earthworks and soil prep before villa construction: geotech survey, retaining design, then the build. Cliff sites reward careful staging and punish shortcuts, so we sequence excavation ahead of the wet season.
Which trades are covered in one turnkey contract?
All of them: skimming and plastering, granite and stone laying, waterproofing, electrical installation, air-conditioning with scheduled AC maintenance, CCTV and a whole-house water filter. One contract, one site manager, no finger-pointing between subcontractors.
What building regulations apply to foreign villa owners?
Building regulations for foreign villa owners in Bali come down to land title, zoning (ITR), and the PBG building permit. We check zoning before design, file the PBG, and hand over an as-built set that matches the permit — the paperwork survives resale.
Is it worth pre-wiring for smart home and solar?
Yes — smart home automation improves villa rental yield because guests rate control and security highly, and conduit laid during the build costs a fraction of retrofitting. We also size the roof for a solar system that keeps essentials running through a power outage.
SEC 07 / FIELD NOTES
Guides from our engineers
SEC 08 / SITE UPDATE
September 2026 site update
September on our sites is about sequencing: crews are pushing weather-exposed stages — pours, roofs, external works — through the last reliably dry weeks, while interior trades queue up to carry each project through the rainy season. Every crew we field is committed to live projects, and deliveries to hillside plots are being front-loaded before access turns treacherous.
For anyone planning a build, this is the month the calendar gets decided. A scope confirmed now can still break ground in Q4 2026 and reach weather-tight before the wettest months; enquiries that land once the rains have settled in will realistically mobilise in Q1 2027 — still a fine start, just a different order of stages. Rain doesn't stop a well-planned build here, it just rewrites the sequence.
Because we keep a fixed roster of crews instead of hiring seasonally, start slots genuinely run out. If a 2026 start matters to you, begin with the free site survey — it fixes the scope, and the scope fixes the schedule.